
HANFORD, Wash. – A pipe fitting failure at the Hanford site led to a burst of water, but prompt action by Hanford Mission Integration Solutions kept the situation under control.
The failure, caused by corroded bolts, resulted in nearly 2,800 gallons of water spilling over the roadway and the side of a nearby building.
The Hanford Mission Integration Solutions Construction, Testing & Commissioning team responded within minutes, isolating the leak and minimizing disruption.
Their swift response ensured that the incident was handled efficiently, preventing further issues.
